Five stages.
Five artifacts.
Thermocouple Mapping
Delivered to QC before heat-up
Controller Setup & Ramp Rate
Signed by crew lead, filed to job package
Temperature Hold Monitoring
Signed by Level II PWHT technician
Cooldown Slope Overlay
Overlaid on recorder chart, deviation-flagged
PE-Stamped PWHT Report
PE-stamped, inspector-ready, 24hr delivery
Download a real
PWHT report.
Before you recommend a PWHT contractor to procurement, you need to see the documentation. This is an unredacted report from a 2024 pipeline tie-in — full recorder traces, thermocouple layout, hold certificate, cooldown overlay, and PE stamp.
Get the sample report
Engineering access only — no sales follow-up.
Four project types.
One documentation standard.
Pipeline Tie-Ins

Refinery Turnarounds

Structural Connections

Pressure Vessels
Send us your
weld map.
Upload your isometric or weld map and we'll return a thermocouple layout sketch and mobilization estimate within one business day — before any PO is signed.
Direct Line
(432) 555-0178
Mon–Fri 6AM–6PM CT
ops@anneal-pwht.com
Response within 4 hours
Service Area
Permian Basin & Gulf Coast
Nationwide mobilization available